Battery Technology is part of the Informa Markets Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

Messer Plans New $50M Solar Powered ASU in US

Article-Messer Plans New $50M Solar Powered ASU in US

Image courtesy of Kristoffer Tripplaar / Alamy Stock Photo messer_building_image.jpg
A facility occupied by The Messer Group in the US. Representative image.
The industrial gas firm will support chemical makers, food and beverage plants, and other industries in central Texas.

Industrial gas supplier Messer announced this week that a new $50 million air separation unit (ASU) will be erected in McGregor, TX that receive most of its electricity from solar panels installed at the site.

“With our expansion in Texas and the inclusion of solar energy, Messer is focused on sustainability and environmental protection,” the president and CEO of Messer Americas, Jens Luehring, said in a release. “As we move to a renewable-based future, this investment is integral for our green energy initiatives as we continue to serve our customers with a reliable source of supply.”

Once operational, the facility will serve a range of industries in central Texas, including food and beverage, chemical, metals, and oil and gas.

Work on the site is slated to reach completion in the second quarter of 2024.

Hide comments
account-default-image

Comments

  • Allowed HTML tags: <em> <strong> <blockquote> <br> <p>

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
Publish